Stanley House, Marsden, Huddersfield

Type: Conversion of existing stables into 6No houses.
Duration: 12 months.
Problems/obstacles/solutions: Constant water ingress into site due to several collapsed/blocked culverts. Resolved by extensive excavations and drainage works re routing water around the perimeter of the site and into local water source. No mains water  or gas to site. Resolved by extensive excavations through local field to highway and new services installed.
Cost: £480K tendered contract.
Specification: Medium to high specified by architect and client.