Type: Roof conversion to semi detached bungalow to include master bedroom, bathroom, study and storage space. Duration: 3 months. Specification: Construction of large dormer and new steel structure to allow open spaces. Cost: £28k. [Show slideshow]
By :
Comments : 0

Skircoat Green, Halifax

Type: Complete renovation of large period inner terrace house. Duration: 3 months Specification: Re roof with breathable membrane & new tiles, introduce Velux roof lights, new bathroom & kitchen, re plaster, re wire, re plumb, replace doors & windows, decorate &...
By :
Comments : 0

Hollyngage, Elland, Halifax

*** LABC BUILDING EXCELLENCE AWARD FINALIST *** Type: New build stone detached house with disabled facilities. Duration: 9 months. Specification: High quality finishes to open space design, disabled facilities to include lift to first floor, hoist/track, all round ramp...
By :
Comments : 0

Park Lane, West Bretton, Wakefield

Type: Complete back to brick refurbishment of barn dwelling. Duration: 4 months. Problems/solutions: The whole property suffered with damp & rot – Tanking, re roof, new floors, chemical product applied to masonry, replace structural timbers & windows, natural gas...
By :
Comments : 0

Stanley House, Marsden, Huddersfield

Type: Conversion of existing stables into 6No houses. Duration: 12 months. Problems/obstacles/solutions: Constant water ingress into site due to several collapsed/blocked culverts. Resolved by extensive excavations and drainage works re routing water around the perimeter of the...
Comments : 0

Lee Mills, Scholes, Holmfirth

Type: Conversion of existing building into 4 houses, 2No new build hoses and associated ground works. ( Building works only, client managed all other works.) Duration: 11 months Problems/obstacles/solutions: When excavating for ground works the back elevation of the existing...
Comments : 0

Cambridge Hotel, Huddersfield

Type: Hotel extension including 45 bedrooms, function/conference room, dining room and kitchen, plant room and car park. Duration: 13 months. Problems/obstacles/solutions: Ground investigations found mine workings which were not recorded with the coal board under the footprint of...
Comments : 0

Newmillerdam, Wakefield

Type: New build detached 6 bedroom house. Duration: 9 months Problems obstacles solutions: None, built on traditional strip foundations as ground conditions were good , built to a cavity wall construction with a handmade brick to the face. Cost: £320K tendered contract...
Comments : 0

Sale, Manchester

Type: Extenion to Care home and passenger lift installation. Duration: 4 months. Problems/obstacles/solutions. Bad ground conditions resolved by piled foundations with reinforced ring beam. Cost: £60k. Specification: Specified by architect to match in with existing building...
Comments : 0

Lepton Grange, Lepton

Type: Conversion of large house into 5 bed house with large new build workshop and annex Duration: 8 Months Problems obstacles solutions: Poor ground stability on new build resolved with pile foundations with reinforced ring beam. Specification: specified by architect which...